2xSD 130

Two pump booster sets

Two pump package boosters; installed on base, with check valve on pumping port, pressure gauges and manometers. In the electrical control panel used in the boosters, level switch with 5 m cable against phase error, phase sequence control and waterless operation are included in the standard delivery.Boosters panels have the ability to change sequence and rotation.

Areas of Usage

Technical Informations

Suction nozzle

Discharge nozzle

Flow rate (Max.)

Head (Max.)

Speed (Max.)

Fluid temperature (Max.)

Operating voltage

Flow Rate (Max.)

Head (Max.)

Flow Rate (Max.)

Head (Max.)

preloader